-
Windows were finished inside yesterday
Two windows need molding around them on the inside of the house. (My office and a stubbed bathroom in the “basement.”) All windows then need caulking between quarter-round and casing, then prime, then white enamel. The house siding is nearly all installed. A very long job. The crew (sub-contracted) doing it got reamed out by…
-
New Windows and Siding
Windows were installed on Monday and finished on Tuesday. We do have to foam fill the sides and top, and put additional casing all around the windows on the inside (except the kitchen window, it’s completely installed in and out.) These windows are triple pane, .25 U-factor (4) A super duper upgrade to what was…